Go Back Modular - Educational
Project Location:
Clyde North, Victoria
Building Size:
1300 sqm
Completion Date:
May, 2019
The design, manufacture and install of Hillcrest Christian College was a unique job for Grove, being contacted directly by the client to provide an innovating modular learning space.
Working directly with the client meant that Grove weren’t responsible for all aspects of the job with surrounding works being undertaken by external providers contracted directly by the school.
As such, Grove showcased their adaptability and flexibility to work within the timeframes set, ensuring their element of the job met the brief and was delivered on time and within budget.
Within 7 weeks, the Grove team were able to manufacture and install the building onsite to a working and functioning solution. The build time within the factory took 4 weeks, with the remaining time spent onsite installation the facility.
Grove Group Hillcrest College - Kylie Iva Photography-19